Grant County Wind located in Hoffman, Minnesota, is the first off-island wind energy project acquired by Aspenall Energies. The project, located in private agricultural land, consists of 10 S88 2.1 MW wind turbines manufactured by Suzlon, with a total installed capacity of 21 MW. This project started commercial operations in August of 2010, and has a 20 MW Power Purchase Agreement with Northern States Power for 20 years.

Fact Sheet:
Estimated Annual Energy Production: 64,000,000 kWh/yr

CO2 offset: 48,646 tons
Turbine: Suzlon S88 V3 2.1MW
Rotor diameter: 289 feet
Tip height: 407 feet
Installation height: 262 feet